https://repositorio.ufba.br/handle/ri/38418
Tipo: | Trabalho de Conclusão de Curso |
Título: | Estudo das chavetas da barragem de ligação direita de Itaipu |
Autor(es): | Fiore, Paola María Camila Villalba |
Primeiro Orientador: | Patias, Josiele |
metadata.dc.contributor.advisor-co1: | Kuperman, Selmo |
metadata.dc.contributor.referee1: | Patias, Josiele |
metadata.dc.contributor.referee2: | Kuperman, Selmo |
metadata.dc.contributor.referee3: | Medeios, Carlos Henrique |
metadata.dc.contributor.referee4: | Campos, Luís Edmundo Prado |
Resumo: | Depois de 40 anos da construção da Usina Hidrelétrica de Itaipu existem vários desafios a longo prazo que precisam ser realizados pela equipe técnica para manter o alto nível de excelência no monitoramento da estrutura. Para um profissional realizar a Análise do Comportamento da Barragem é importante conhecer o projeto, como foi dimensionado, como foi construído para facilitar as tomadas de decisão. As chavetas foram construídas para suprir uma deficiência da fundação, falha geológica identificada com os ensaios geotécnicos durante a fase de construção. A finalidade das chavetas foi fornecer a resistência necessária contra o deslizamento e diminuir a deformabilidade das feições mais críticas da fundação. Conhecer a história do particular reforço estrutural e avaliar sua eficiência após 40 anos de construção é considerado de alta relevância para a análise da Segurança Estrutural da Barragem de Itaipu. O trabalho objetiva estudar o fenômeno do cisalhamento nas fundações de barragem, analisar o dimensionamento das chavetas do trecho E e avaliar a eficiência das chavetas após 40 anos de construção. A metodologia utilizada foi a pesquisa teórica, bibliográfica e documental utilizando os documentos do arquivo técnico: relatórios técnicos, memoria de cálculo, ensaios e desenhos. |
Abstract: | After 40 years of the construction of the Itaipu Hydroelectric Plant, there are several long-term challenges that need to be carried out by the technical team to maintain the high level of excellence in monitoring the structure. For a professional to perform the Dam Behavior Analysis, it is important to know the project, how it was designed, how it was built to facilitate decision making. The shear keys were built to supply a deficiency in the foundation, a geological discontinuity identified by geotechnical tests during the construction phase. The purpose of the shear keys was to provide the necessary resistance against slipping and to reduce the deformability of the most critical features of the foundation. Knowing the history of the particular structural reinforcement and evaluating its efficiency after 40 years of construction is considered of high relevance for the analysis of the Structural Safety of the Itaipu Dam. The work aims to study the phenomenon of shearing in dam foundations, analyze the dimensioning of the shear keys of section E and evaluate the efficiency of the shear keys after 40 years of construction. The methodology used was theoretical, bibliographic and documentary research using the documents from the technical archive: technical reports, calculation memory, tests and drawings. |
Palavras-chave: | Usina Hidrelétrica Itaipu Barragens - Fundação Modelo geomecânico Chavetas |
CNPq: | CNPQ::ENGENHARIAS::ENGENHARIA SANITARIA::RECURSOS HIDRICOS |
Idioma: | por |
País: | Brasil |
Editora / Evento / Instituição: | Universidade Federal da Bahia |
Sigla da Instituição: | UFBA |
metadata.dc.publisher.department: | Escola Politécnica |
Tipo de Acesso: | CC0 1.0 Universal |
metadata.dc.rights.uri: | http://creativecommons.org/publicdomain/zero/1.0/ |
URI: | https://repositorio.ufba.br/handle/ri/38418 |
Data do documento: | 30-Jan-2021 |
Aparece nas coleções: | Trabalho de Conclusão de Curso (Especialização) - Segurança de Barragem: Aspectos Técnicos e Legais (Escola Politécnica) |
Arquivo | Descrição | Tamanho | Formato | |
---|---|---|---|---|
Paola Villalba.pdf | 2,79 MB | Adobe PDF | Visualizar/Abrir |
Este item está licenciada sob uma Licença Creative Commons