Campo DC | Valor | Idioma |
dc.contributor.advisor | Lima, George Marconi de Araújo | - |
dc.contributor.author | Santor-Jr., José | - |
dc.contributor.author | Lima, George Marconi de Araújo | - |
dc.creator | Santor-Jr., José | - |
dc.creator | Lima, George Marconi de Araújo | - |
dc.date.accessioned | 2013-03-28T12:51:45Z | - |
dc.date.available | 2013-03-28T12:51:45Z | - |
dc.date.issued | 2013-11 | - |
dc.identifier.uri | http://www.repositorio.ufba.br/ri/handle/ri/9291 | - |
dc.description.abstract | We provide four new schedulability tests for a scheduling model according to which there is a high priority task concurrently executed with a set of EDF-scheduled tasks. All tests are proved correct and have their performance evaluated by simulation. | pt_BR |
dc.description.sponsorship | UFBA (Edital PROPI 2011); CNPq (Edital Universal); CAPES (Bolsa de doutorado) | pt_BR |
dc.language.iso | en | pt_BR |
dc.publisher | Sociedade Brasileira de Computação | pt_BR |
dc.subject | real-time systems | pt_BR |
dc.subject | schedulability tests | pt_BR |
dc.subject | EDF | pt_BR |
dc.title | Sufficient Schedulability Tests for EDF-Scheduled Real-Time Systems under Interference of a High Priority Task | pt_BR |
dc.type | Artigo de Evento | pt_BR |
dc.description.localpub | Natal, Rio Grande do Norte | pt_BR |
dc.identifier.number | Proc. of the Brazilian Symposium on Computing Engineering (SBESC 2012) | pt_BR |
Aparece nas coleções: | Livro e Capítulo (PGCOMP)
|