dc.description.abstract | A indústria da construção civil passa por um momento de grandes transformações, buscando alterar seus processos de produção. O uso do Building Information Modeling (BIM) possibilita a melhoria da qualidade do produto, permitindo a integração das fases do ciclo de vida da edificação, contribuindo para a gestão das atividades, reduzindo o retrabalho e os conflitos entre disciplinas, fomentando a comunicação entre os envolvidos etc. No entanto, para que o BIM seja incorporado, é necessário reestruturar o processo do projeto, de modo que haja maior colaboração entre os projetistas, resultando em desafios para as práticas gerenciais. Neste contexto, esta pesquisa envolve a observação de um problema prático com vistas à obtenção de contribuições teóricas e operacionais, na implantação de BIM na fase da projetação. O objetivo geral desta pesquisa é contribuir para a melhoria do processo de projeto na SUMAI por meio do uso da Modelagem da Informação da Construção. O método de pesquisa utilizado foi o Design Science Research por se basear na resolução de problemas enfrentados no mundo real. Assim, a pesquisa cobriu as principais etapas do método: identificação do problema, análise e diagnóstico (através do estudo de caso único); desenvolvimento da solução/intervenção (plano de execução BIM); e avaliação/comunicação. O plano de execução BIM foi avaliado através de três critérios: operacionalidade (análise da funcionalidade do artefato); generalidade (delimitação do uso do artefato nos diversos tipos de projetos); e facilidade de uso (observação da usabilidade do artefato pelos técnicos do órgão). Com base nas avaliações e na literatura, infere-se que o artefato poderá ser usado como versão inicial na implantação do BIM no órgão, possibilitando a sistematização dos processos de trabalho, facilitando a interação das disciplinas de projeto, a manipulação de suas informações e abordando o processo de projeto de forma colaborativa, a fim de integrar as partes envolvidas. Dentre os resultados da pesquisa, destaca-se que: (a) a explicitação detalhada dos processos em uso é essencial na otimização / substituição dos mesmos; (b) o planejamento da implantação de BIM deve considerar o contexto específico da instituição; (c) na inserção do BIM nos processos de projeto deverá ser promovida a integração entre disciplinas e as atividades de todos os envolvidos; (d) as funções e responsabilidades de cada um dos envolvidos na projetação precisam estar bem definidas; (e) a sistematização das atividades, com prazos, responsáveis, insumos necessários e produtos relacionados às mesmas devem ser previamente explicitados; (f) os procedimentos de colaboração e gestão do processo de projeto devem estar claramente definidos; (g) devem ser definidas as premissas para a elaboração do modelo BIM de modo que o mesmo seja útil nas demais fases do ciclo de vida da edificação; (h) é relevante estabelecer as verificações a serem realizadas visando garantir a qualidade do modelo. Deste modo, espera-se contribuir para a melhoria dos processos de projeto da instituição. | pt_BR |
dc.description.abstract | The civil construction industry is going through a time of great transformations, seeking to change their production processes. The use of Building Information Modeling (BIM) integrates building lifecycle phases, contributes to the management of activities, improves product quality, reduces reworks and conflicts between disciplines, fosters communication among those involved etc. However, in order for BIM to be incorporated, it is necessary to restructure the design process, so that there is greater collaboration among designers, resulting in challenges for managerial practices. In this context, this research involves the observation of a practical problem in order to obtain theoretical and operational contributions, in the implementation of BIM in the project phase. The overall objective of this research is to contribute to the improvement of the design process at SUMAI through the use of Building Information Modeling. The research method used was Design Science Research because it was based on solving problems faced in the real world. Thus, the research covered the main steps of the method: problem identification, analysis and diagnosis (through the single case study); development of the solution / intervention (BIM implementation plan); and evaluation / communication. The BIM execution plan was evaluated through three criteria: operability (analysis of artifact functionality); generality (delimitation of the use of the artifact in the different types of projects); and ease of use (observation of the usability of the artifact by the organ technicians). Based on the evaluations and literature, it is inferred that the artifact can be used as an initial version in the implantation of BIM in the organ, enabling the systematization of the work processes, facilitating the interaction of the design disciplines, the manipulation of its information, and approaching the design process in a collaborative way, in order to integrate the parties involved. Among the results of the research, it is highlighted that: (a) the detailed explanation of the processes in use is essential in the optimization / substitution of the same; (b) planning the implementation of BIM considering the specific context of the institution; (c) the inclusion of BIM in the design processes should promote the integration between disciplines and the activities of all those involved; (d) the roles and responsibilities of each of those involved in the project need to be well defined; (e) the systematization of the activities, with deadlines, responsible, necessary inputs and related products are previously explained; (f) the procedures for collaboration and management of the project process are clearly defined; (g) the premises for the elaboration of the BIM model are defined so that it is useful in the other phases of the lifecycle of the building; (h) it is relevant to establish the verifications to be carried out in order to guarantee the quality of the model. Thus, it is hoped to contribute to the improvement of the institution's design processes. | pt_BR |
dc.language.iso | pt_BR | pt_BR |
dc.rights | Acesso Aberto | pt_BR |
dc.subject | Architectural design | pt_BR |
dc.subject | Building information modeling | pt_BR |
dc.subject | Edifícios públicos - Projetos e construção | pt_BR |
dc.subject | Modelagem de informação da construção | pt_BR |
dc.subject | Projeto arquitetônico | pt_BR |
dc.subject | Public buildings - Design and construction | pt_BR |
dc.subject | Universidade Federal da Bahia. Superintendência de Meio Ambiente e Infraestrutura | pt_BR |
dc.title | Modelagem da informação da construção na fase de projeto: uma proposta de plano de execução BIM para a SUMAI / UFBA | pt_BR |
dc.type | Tese | pt_BR |
dc.contributor.referees | Amorim, Arivaldo Leão de | - |
dc.contributor.referees | Scheer, Sergio | - |
dc.contributor.referees | Ferreira, Emerson de Andrade Marques | - |
dc.contributor.referees | Velame, Fabio Macedo | - |
dc.contributor.referees | Groetelaars, Natalie Johanna | - |
dc.contributor.referees | Checcucci, Érica de Sousa | - |
dc.publisher.departament | Faculdade de Arquitetura | pt_BR |
dc.publisher.program | Programa de Pós-Graduação em Arquitetura e Urbanismo | pt_BR |
dc.publisher.initials | UFBA | pt_BR |
dc.publisher.country | brasil | pt_BR |
dc.subject.cnpq | Arquitetura e Urbanismo | pt_BR |
Aparece nas coleções: | Tese (PPGAU)
|